A roof fall occurred in the 9 Seam panel 4 entry 5 between 101 and 102 crosscut in the inactive workings. The roof fall measured approximately 70'L x 9'T x 18'W. The roof fall will not be cleaned up. The roof was supported with 5' fully grouted roof bolts. The date of development 3/2018.