A roof fall occurred in the 9 seam in the 1st Northeast submain panel 1 at xcut 9 between 8 and 9 entries. The roof fall will not be cleaned up. The roof was supported with 6' fully grouted bolts and 8' megabolts as supplemental. Date of development 10/2017.