Power bumped and caused the Rodeo shaft to be down for more than thirty minutes. No one was on the cage at the time of power bump. Power bump was caused by outside source and beyond the control of Goldstrike UG. A courtesy call to the MSHA hotline was made with a follow up call to Gary Hebal the Elko field office supervisor.