On 09/17/2018, The superintendent came into the plant after Hurricane Florence had subsided. EE noticed that the Railroad pond impoundment had breached. This was at 6:57 am. We immediately called the MSHA hotline and reported the failure. There were no injuries due to the failure of the impoundment.