EE stated Continuous Miner lost power so EE walked down to power center. When they arrived section electrician was trouble shooting C/M cathead. Electrician then said they were about to put the power in on C/M. In the process of putting power on the machine a cable splice grounded, causing the cable to blow up beside the injured employees face.