Two Miners and one supervisor were installing 24"" x 25' plastic pipes. Normally equipment is used to place pipes, but this was impossible due to the location of this specific section of pipe. Miners were physically moving the pipe into place by hand. Miner felt lower-right back and leg pain while lifting and pushing pipe into place.