An Unplanned and Reportable Roof Fall occurred at #26 Block, #8 entry outby the section tailpiece on the D-Mains Working Section (MMU 001-0 & 005-0). There was no injuries, no equipment damage and the ventilation system was not disrupted. The occurrence was immediately reported.