Power was lost to the main hoist last night (5/22) at approximately 10:15PM. Employee called the hotline to report the hoist being down. Power was restored at approximately 1:20AM (5/23) and employee contacted the hotline again at that time. Power loss was due to a line fuse blown on KU's end.