Chippy cage in TRJV 3rd shaft came out of guides. The cage & crosshead wrapped around #2 hoist rope. No visual rope damages awaiting NDT inspection of ropes. There was never loss of secondary egress. Gave courtesy notification to MSHA regional supervisor and to the State.