At 7am on 8/10/20 the production hoist went down due to a power feed failure from Cleveland Public Power. The initial power problem was remedied at approx. 1pm. However, during the process of resetting the production hoist a second power failure occurred at the CPP substation. This problem was also resolved by CPP and crews began heading back into the mine at approx. 4:15pm.