Maintenance repair in a tank (confined Space). Contractor was working from JLG/Manlift. Equipment malfunction. Equipment stuck in elevated position. At approximately 4:30 pm the employee was removed from tank via overhead opening. No injuries. Employee was task trained to operate equipment. Documentation of a pre-shift equipment inspection.