Surface lost power, which affected the mine. After generators were started, #2 hoist had a brake fault, which was found during checks. Miners were staged at 2 hoist. Issue on hoist was resolved and mine was evacuated. Mine still had utility power for 6 shaft. MSHA was called when issue was resolved on hoist.