Apx. 760' HPDE pipe was being pulled down an access road. Around a 100 degree bend, the pipe developed resistance from unidentified debris (presumed rock). The resistance gave way and the tension applied from pulling the pipe caused it to straighten striking and employee inspecting for holes.