IE was taking the discharge line apart on the cyclone refuse pump because IE thought it was plugged with material. IE removed the bolts from the flange on the discharge line. When the line was pulled apart, material came out of the pipe and hit IE. The material inside the pipe was heated due to the pump not priming. IE received prescription burn cream.