Power was lost to the hoist for approx. 2 hours. No personnel were on the conveyance at the time of power loss. 91 people were underground at the time of the incident with two means of escape remaining available. It was found the SE330 neutral ground resistor monitor experienced a watch dog trip which reset the processor.