performing hoist pre-operation checks a communication fault occurred brakes unable to release. NGM and OEM technicians found communication issue with a motor current signal wire not being processed by the PLC. Wire was disconnected and reconnected. HMI/PLC was able to update and signal properly. After discovered and repaired hoist checks were performed and passed without incident.