Motor on main hoist overheated causing Nordberg Main Sinking Hoist to be inoperable. This condition was found on the pre-shift inspection of the hoist after an idle shift. There were no people in the shaft at the time of the malfunction of the main hoist. The shift for the regular crew was set to begin at 6:00 am.