AT 6:15 THE #2 COAL BELT WAS STAGED DOWN. AT 7:15 THE PRODUCTION SUPERVISOR SAW SMOKE COMING FROM THE NORTH SIDE OF THE PLANT. AT 7:25 THE PRYOR FIRE DEPARTMENT WAS CALLED. DURING THIS TIME A HEAD COUNT WAS CONDUCTED. AT 7:45 THE FIRE DEPARTMENT ARRIVED ONSITE. AT 8:00 THE FIRE WAS PUT OUT. AT 8:39 MSHA WAS CALLED TO REPORT THE FIRE.