At approximately 7:08 am 1/2/25 the 6 West Continuous Miner intersected the water infused center leg of SC4 CBM gas well. Methane concentrations temporarily went over +2.5%, but were down to 0.3% by the time packers were installed in the well bore (approximately 20 minutes after intersection). No problems with equipment or compliance issues, training or PPE.