#2 hoist (Primary) went down due to electrical problem, Maintenance Coordinator and electrician used #3 hoist to reach surface. Maintenance conducted troubleshooting and found a bad coil on the main brake. Maintenance replaced the bad coil on the main brake and #2 hoist was up and operating at 9:50 pm. #3 & #6 hoist were still operable during this time.