The hoist operator reported a chute issue. Production supervisor was notified at 9:18AM that maintenance was going to check the chute. The time reached the 30 minute mark at 9:48AM and an evacuation order was given. MSHA hotline was then notified at 9:56AM. Excess material was not allowing the chute to close causing a fault to the PLC. No miners were injured.