# NRC CAL – NOV (White)
> **EA-02-243** · CAL · Issued 2003-02-07 · Reactor Licensees
## Action
- **EA Number:** EA-02-243
- **Licensee:** NOV (White)
- **Category:** Reactor Licensees
- **Action type:** CAL
- **Date issued:** 2003-02-07
## Description

On February 7, 2003, a Notice of Violation was issued for a violation associated with a White SDP finding involving the possible loss of high pressure injection (HPI) pump function during a postulated high energy line break/tornado event recovery. The violation cited the licensee's failure to properly implement the vendor's written instructions for attaching the electrical connectors on the pre-staged Unit 3 HPI pump emergency power supply cable from the auxiliary service water (ASW) switchgear.

## Source
- [Full enforcement letter (PDF)](https://www.nrc.gov/docs/ML0304/ML030420158.pdf)
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*MORVS · CC0 1.0*