# NRC CAL – NOV (White)
> **EA-04-076** · CAL · Issued 2004-06-02 · Reactor Licensees
## Action
- **EA Number:** EA-04-076
- **Licensee:** NOV (White)
- **Category:** Reactor Licensees
- **Action type:** CAL
- **Date issued:** 2004-06-02
## Description

On June 2, 2004, a Notice of Violation was issued for a violation associated with a White SDP finding involving the failure to take adequate corrective action for conditions adverse to quality associated with the No. 3 emergency diesel generator (EDG 3) jacket water cooling (JWC) system. The corrective maintenance performed to stop a pipe coupling leak on the JWC supply line to the turbo charger for EDG 3 failed to correct the leak. The violation also cited the failure to comply with Technical Specification 3.8.1, AC Sources Operating, because due to the ongoing leak the EDG 3 was inoperable while the plant was in Mode 1 for a period in excess of seven days.

## Source
- [Full enforcement letter (PDF)](https://www.nrc.gov/docs/ML0415/ML041590186.pdf)
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*MORVS · CC0 1.0*