# NRC ORDER – NOV(SL-TBD)
> **EA-07-212** · ORDER · Issued 2007-08-30 · Reactor Licensees
## Action
- **EA Number:** EA-07-212
- **Licensee:** NOV(SL-TBD)
- **Category:** Reactor Licensees
- **Action type:** ORDER
- **Date issued:** 2007-08-30
## Description

On August 30, 2007, a Notice of Violation was issued for failure to meet the conditions of a July 30, 2007, Order which required the licensee to implement an Emergency Notification System (ENS) with backup power capability by August 24, 2007. Specifically, the licensee failed to obtain necessary approvals so that the new ENS system could be placed in service as the primary notification system by August 24, 2007. The NRC will determine the severity level, any civil penalty, and any required responses from Entergy regarding this matter at a later time.

## Source
- [Full enforcement letter (PDF)](https://www.nrc.gov/docs/ML0724/ML072410542.pdf)
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*MORVS · CC0 1.0*