# NRC NOV – NOV (White)
> **EA-08-192** · NOV · Issued 2008-09-04 · Reactor Licensees
## Action
- **EA Number:** EA-08-192
- **Licensee:** NOV (White)
- **Category:** Reactor Licensees
- **Action type:** NOV
- **Date issued:** 2008-09-04
## Description

On September 4, 2008, a Notice of Violation was issued for a violation associated with a White Significance Determination Finding to Southern Nuclear Operating Company, as a result of overhaul of its 1B emergency diesel generator (EDG) at the Joseph M. Farley Nuclear Plant. The violation cited the licensee for failure to install a new exhaust header system correctly, as required by vendor documents, causing the 1B EDG to be declared inoperable.

## Source
- [Full enforcement letter (PDF)](https://www.nrc.gov/docs/ML0824/ML082480616.pdf)
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*AI Analytics · CC0 1.0*