# NRC CAL – NOV (White)
> **EA-09-269** · CAL · Issued 2010-01-20 · Reactor Licensees
## Action
- **EA Number:** EA-09-269
- **Licensee:** NOV (White)
- **Category:** Reactor Licensees
- **Action type:** CAL
- **Date issued:** 2010-01-20
## Description

On January 20, 2010, a Notice of Violation was issued to Entergy Nuclear Operations, Inc. for a violation associated with a White Significance Determination Finding as a result of inspections at the Palisades Nuclear Plant. This White finding involved the licensee's failure to meet the requirements of Technical Specification (TS) for fuel storage in the spent fuel pool (SFP). Specifically, the Region I spent fuel pool storage rack neutron absorber had deteriorated over the life of the plant and was less than required by TS. Corrective actions are currently in place for additional controls of the spent fuel pool.

## Source
- [Full enforcement letter (PDF)](https://www.nrc.gov/docs/ML1002/ML100200720.pdf)
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*MORVS · CC0 1.0*