# NRC NOV – NOV (SL II & III)
> **EA-96-365** · NOV · Severity SLII · Issued 1997-03-12 · Reactor Licensees
## Action
- **EA Number:** EA-96-365
- **Licensee:** NOV (SL II & III)
- **Category:** Reactor Licensees
- **Action type:** NOV
- **Severity level:** SLII
- **Date issued:** 1997-03-12
## Description

The violations identified indicate a broad spectrum of problems exist in FPC's Engineering program at Crystal River Unit 3. The action includes: (1) a Severity Level II problem for failure to meet the requirements of 10 CFR 50.59 in six cases; (2) a Severity Level III violation for failure to ensure that regulatory and plant design basis requirements are met; and, (3) a Severity Level III violation for untimely and inadequate corrective actions resulting in the failure to identify significant unreviewed safety questions and containment integrity issues.

## Source
- [NRC Reactor Licensees index](https://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/reactors/)
---
*MORVS · CC0 1.0*