# NRC NOV – NOV (SL III)
> **EA-99-002** · NOV · Severity SLIII · Issued 1999-04-28 · Reactor Licensees
## Action
- **EA Number:** EA-99-002
- **Licensee:** NOV (SL III)
- **Category:** Reactor Licensees
- **Action type:** NOV
- **Severity level:** SLIII
- **Date issued:** 1999-04-28
## Description

Violation occurred because the on-shift crew, the operations support group, and the WEPCo site management team failed to acknowledge the validity of the temperature alarm and appreciate the significance of low temperature readings for the Unit 1 SI pumps' minimum flow line.