{"url_path":"/sec/fngr/8-k/2026-06-09/item-7-01","section_key":"item-7-01","section_title":"Item 7.01 Regulation FD Disclosure**","topic":"sec","document":{"doc_type":"8-K","doc_date":"2026-06-09","source_url":"https://www.sec.gov/Archives/edgar/data/1602409/0001520138-26-000223-index.html","accession_number":"0001520138-26-000223","cik":"0001602409","ticker":"FNGR","issuer_name":"FingerMotion, Inc.","edgar_url":"https://www.sec.gov/Archives/edgar/data/1602409/0001520138-26-000223-index.html","primary_entity_key":"0001602409","primary_entity_name":"FingerMotion, Inc."},"word_count":1355,"has_tables":true,"body_markdown":"**Item 7.01 Regulation FD Disclosure**\n\nOn June 9, 2026, FingerMotion, Inc. (the “**Company**”\nor “**FingerMotion**”) issued a news release to announce that it has entered into a Memorandum of Understanding (the “**MOU**”)\nwith BlueFlare Energy Solutions Inc. (“**BlueFlare**”), an Alberta-based developer, engineer and constructor of behind-the-meter\n(“**BTM**”) energy and high-performance compute infrastructure, to jointly develop a distributed network of micro-scale\nedge AI inference compute sites across Western Canada. In conjunction with the MOU, the Company and BlueFlare will also consider a non-binding\nCommercial Term Sheet (the “**LOI**”), with the first behind-the-meter project to be advanced under the collaboration,\na site located in Alberta, Canada and designated PR1 (the “**PR1 Project**”). The draft non-binding LOI reflects the parties’\nagreement to proceed and has not been executed.\n\n \n\nA Distributed Edge AI Inference Network for Western\nCanada\n\n \n\nThe MOU establishes BlueFlare as FingerMotion’s\nexclusive partner within the Canadian provinces of Alberta, British Columbia and Saskatchewan for the origination, design, engineering,\nconstruction and ongoing support of co-located AI inference compute sites and bitcoin mining sites. The collaboration is built around\nBlueFlare’s “From Wellhead to Workload” platform and its proprietary BALA™ (BlueFlare Adaptive Load Architecture™)\nload-following technology.\n\n \n\nFingerMotion intends to use the collaboration to build\na distributed network of micro-scale edge AI inference compute sites, each typically in the 0.5 megawatt (“MW”) to 2 MW range,\nsited directly behind the meter at producing or recently-producing natural gas fields in Western Canada. The Company believes that, compared\nto centralized hyperscale data centers, a distributed edge compute model may offer differentiated advantages across the following dimensions:\n\n \n\n•**Energy economics.** Direct, BTM access to low-cost on-site natural\ngas, with electricity generated and consumed without traversing the transmission grid.\n\n•**Latency.** Geographic proximity to regional users and devices, which\nis particularly relevant for AI inference workloads compared to bulk AI training.\n\n•**Speed of deployment.** Standardized, containerized infrastructure designed\nfor rapid build-out, in contrast to the multi-year build cycles typical of large-scale data centers.\n\n•**Capital efficiency.** Modular site economics that the Company believes\ncan be financed and replicated incrementally across the network.\n\n•**Resilience.** A distributed footprint that is intended to reduce single-site\nconcentration risk relative to centralized facilities.\n\nThe Role of BlueFlare’s BALA™ Platform\n\n \n\nBALA™ (BlueFlare Adaptive Load Architecture™)\nis BlueFlare’s proprietary load-following platform. It is designed to dynamically balance, at each site and in real time, AI inference\ncompute workloads with co-located bitcoin mining loads, with the bitcoin mining load functioning as a load-balancing and gas-continuity\nmechanism rather than a primary use case.\n\nAt a network level, BALA™ is designed to allow\neach site to:\n\n \n\n•absorb available natural gas generation capacity at all times by flexing\nthe bitcoin mining load up or down as inference compute demand varies;\n\n•maintain steady operating temperatures and gas burn profiles regardless\nof compute load, supporting equipment longevity and emissions performance; and\n\n•preserve the economic case for the site even during periods of lower inference\ndemand, by continuing to convert generated electricity into bitcoin mining revenue.\n\n \n\n \n\nFingerMotion believes that BALA™ is a\nkey differentiator of the proposed network, as it is designed to make small-scale, distributed edge compute sites economically viable\nin a manner that traditional standalone designs have struggled to achieve.\n\nPR1 — First Project Under the Collaboration\n\n \n\nFingerMotion will look at the existing behind-the-meter\nBitcoin mining infrastructure and mining hardware at the PR1 site, together with ongoing host-operated energy and operational services\nto be provided by BlueFlare, subject to satisfactory due diligence, the negotiation and execution of definitive agreements, and other\ncustomary closing conditions. Thus, the proposed scope of the LOI will include:\n\n \n\n•**Bitcoin Mining Infrastructure.** A 1.0 MW air-cooled Bitcoin mining\ncontainer (manufactured by TNDS), including container-level electrical distribution, busbar and power distribution, cooling, ventilation\nand environmental control systems.\n\n•**Mining Hardware.** 120 active Bitmain Antminer S21 Pro 234T ASICs (supplied\nwith a 5% dead-on-arrival buffer of 6 additional units, for 126 units delivered in total), representing aggregate nameplate hashrate of\napproximately 28.08 PH/s, intended to operate as the BALA™-managed load-balancing layer for the site.\n\n•**Behind-the-Meter Power Supply.** BlueFlare to retain ownership of the\non-site natural gas generation equipment and to deliver electricity behind-the-meter to the Company’s hardware. The generation equipment\nis retained by BlueFlare and would not form part of any acquisition.\n\n•**Host-Operated Services.** Energy supply, power-generation operations\nand maintenance, and 24/7 network operations centre (NOC) monitoring, provided by BlueFlare on a host-operated basis at a fixed, all-in\nrate of US$0.03 per kWh delivered for an initial three-year term, with a 3% annual escalation thereafter.\n\n•**First Inference Compute Build.** Subsequent construction by BlueFlare\nof a 500 kW containerized AI inference compute data center adjacent to the existing infrastructure, which is intended to be the Company’s\nfirst operational edge AI inference site under the collaboration.\n\n \n\nBlueFlare is expected to act as the developer, designer,\nengineer and construction partner for the inference compute build and the broader site integration, including the deployment of BALA™\nacross the natural gas generation, mining and inference compute layers.\n\n \n\nNetwork Build-Out Strategy\n\n \n\nPR1 is intended to serve as the prototype site for\na broader rollout of distributed edge compute infrastructure across Alberta, British Columbia and Saskatchewan. Additional initial project\nsites currently under evaluation by the parties include two sites which are expected to be advanced under a separate Commercial Term Sheet\nand associated definitive agreement(s). The pace and scale of the network build-out will depend on a number of factors, including the\nsuccessful completion of the PR1 Project, capital availability, site origination, regulatory approvals, and other customary considerations.\n\n \n\n \n\n \n\n“This collaboration represents an important\nmilestone in our strategy to establish a scalable presence in the rapidly growing AI inference infrastructure market,” said Martin\nShen, CEO of FingerMotion. “By collaborating with BlueFlare, we gain access to a highly differentiated platform that combines low-cost\nbehind-the-meter energy, modular compute deployment, and proprietary load-balancing technology designed to maximize asset utilization.\nIf successfully executed, this approach has the potential to accelerate our entry into the edge AI sector, improve capital efficiency,\ncreate new revenue opportunities, and enhance long-term shareholder value through exposure to one of the most dynamic segments of the\ndigital infrastructure market.”\n\n \n\n“Western Canada offers a rare combination of\nlow-cost natural gas, mature energy infrastructure and a regulatory framework that supports BTM compute at scale,” said Landon Ruszkowski,\nChief Executive Officer of BlueFlare Energy Solutions Inc. “Our ‘From Wellhead to Workload’ platform is purpose-built\nfor exactly this kind of distributed deployment, and BALA™ is what makes the per-site economics work. We are pleased to be working\nwith FingerMotion as it plans to enter the Canadian edge compute market, and we believe the PR1 Project will demonstrate the model that\nthe broader network is intended to scale.”\n\n \n\nImportant Information Regarding the MOU and LOI\n\n \n\nThe MOU and the anticipated LOI are non-binding (other\nthan certain customary provisions of the MOU, including those relating to exclusivity, confidentiality, public disclosure, governing law\nand general provisions). Neither the MOU nor the LOI obligates either party to enter into any definitive agreement. The closing of the\nPR1 Project and any other transaction described in this press release is subject to, among other things, the negotiation and execution\nof definitive agreements, the completion of satisfactory due diligence, the receipt of any applicable regulatory or third-party approvals,\nand the satisfaction of other customary closing conditions. There can be no assurance that any such definitive agreement will be reached,\nthat the PR1 Project or any other project described herein will be completed on the terms described or at all, or that the broader network\nbuild-out contemplated herein will proceed as currently anticipated.\n\n \n\nA copy of the news release is attached as Exhibit\n99.1 hereto.\n\n \n\nThe information contained\nin this Item 7.01 of this Current Report on Form 8-K, including Exhibit 99.1, is being furnished and shall not be deemed “filed”\nfor purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject\nto the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933,\nas amended, or the Exchange Act, except as expressly set forth by specific reference in such filing.\n\n \n\n**SECTION 9 – FINANCIAL STATEMENTS AND EXHIBITS**"}