# Correction of Electric Program Standard Contract Forms
> **Rural Utilities Service** · Final rule. · Published 2004-08-27 · Effective 2004-09-27 · 69 FR 52594
## Document
- **Document number:** 04-19584
- **Category:** rural-development
- **Sub-agency:** Rural Utilities Service
- **Federal Register citation:** 69 FR 52594
- **CFR reference:** 7 CFR 1724
- **Publication date:** 2004-08-27
- **Effective date:** 2004-09-27
## Abstract

The Rural Utilities Service (RUS), an agency delivering the United States Department of Agriculture's Rural Development Utilities Programs, is correcting its regulations relating to two RUS forms. RUS Form 211, Engineering Services Contract for the Design and Construction of a Generating Plant, and RUS Form 198, Equipment Contract, are being revised to correct two typographical errors and a numbering error, respectively.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2004/08/27/04-19584/correction-of-electric-program-standard-contract-forms)
---
*AI Analytics · CC0 1.0*