# Specifications and Drawings for Construction of Direct Buried Plant
> **Rural Utilities Service** · Final rule. · Published 2010-09-29 · Effective 2010-09-29 · 75 FR 59933
## Document
- **Document number:** 2010-24420
- **Category:** rural-development
- **Sub-agency:** Rural Utilities Service
- **Federal Register citation:** 75 FR 59933
- **CFR reference:** 7 CFR 1755
- **Publication date:** 2010-09-29
- **Effective date:** 2010-09-29
## Abstract

The Rural Utilities Service (RUS) is amending its regulations on Telecommunications Policies on Specifications, Acceptable Materials, and Standard Contract Forms, by revising RUS Bulletin 1753F-150, Specifications and Drawings for Construction of Direct Buried Plant (Form 515a). The revised specifications will include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and simplify the specifications format.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2010/09/29/2010-24420/specifications-and-drawings-for-construction-of-direct-buried-plant)
---
*AI Analytics · CC0 1.0*