← USDA Federal Register rules

Electric Engineering, Architectural Services and Design Policies and Procedures

rural-development · Rural Utilities Service · Rule · Published 1998-06-29 · Effective 1998-07-29 · 63 FR 35312

Document

Document number
98-16792
Federal Register citation
63 FR 35312
CFR reference
7 CFR 1724
Type
Rule
Action
Final rule.
Category
rural-development
Sub-agency
Rural Utilities Service
Publication date
1998-06-29
Effective date
1998-07-29

Abstract

The Rural Utilities Service (RUS) is amending its regulations on engineering and architectural services. These policies and procedures are presently contained in seven RUS bulletins, which will be rescinded after this regulation becomes effective. This rule simplifies and codifies RUS policy and procedures to be followed by electric borrowers relating to architectural and engineering services. This rule also simplifies and codifies RUS requirements for the planning and design of electric distribution, transmission, and generation systems and facilities owned by RUS borrowers.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown