# Post-Loan Policies and Procedures for Insured Electric Loans
> **Rural Utilities Service** · Direct final rule. · Published 1999-12-28 · Effective 2000-02-11 · 64 FR 72488
## Document
- **Document number:** 99-33639
- **Category:** rural-development
- **Sub-agency:** Rural Utilities Service
- **Federal Register citation:** 64 FR 72488
- **CFR reference:** 7 CFR 1721
- **Publication date:** 1999-12-28
- **Effective date:** 2000-02-11
## Abstract

As a part of its ongoing program to streamline regulations, the Rural Utilities Service (RUS) is amending its regulation on the advance of funds to reflect an increase in the threshold limit from $25,000 to $100,000 for which plant investments may be made in the borrowers' systems and be eligible for insured loan fund financing without being included in an RUS-approved construction work plan (CWP). In addition, RUS has determined to no longer limit borrowers to 130 percent of the project cost estimate for projects in the CWP or amendment and approved loan, as amended, for which prior RUS approval must be obtained. These changes will have the effect of reducing the number of actions by borrowers that would otherwise require RUS approval and will reduce administrative costs to borrowers and to the agency.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1999/12/28/99-33639/post-loan-policies-and-procedures-for-insured-electric-loans)
---