# NHTSA Preliminary Evaluation PE90018
> **LPG FURNACE EXPLOSION** · Opened 1989-11-21 · Closed 1990-02-22
## Investigation
- **Action number:** PE90018
- **Type:** Preliminary Evaluation
- **Open date:** 1989-11-21
- **Close date:** 1990-02-22
- **Manufacturer:** HYDRO FLAME CORP.
- **Affected makes:** HYDRO FLAME
- **Affected components:** VISIBILITY:DEFROSTER/DEFOGGER/HVAC SYSTEM
- **Affected model years:** 1981, 1982, 1983, 1984, 1985
- **Affected (make, year) variants:** 5
## Summary

There is no summary currently available

## Source
- [NHTSA ODI investigation page](https://www-odi.nhtsa.dot.gov/owners/SearchResults?searchType=ID&targetCategory=I&searchCriteria.nhtsa_ids=PE90018)
---
*AI Analytics · CC0 1.0*