Airworthiness Directives; General Electric Company Turbofan Engines
airworthiness · Rule · Final rule. · Published 2023-04-05 · Effective 2023-05-10 · 88 FR 20067
Document
Document number
2023-07005
Federal Register citation
88 FR 20067
Type
Rule
Action
Final rule.
Category
airworthiness
Manufacturer
General Electric Company Turbofan
Publication date
2023-04-05
Effective date
2023-05-10
FAA docket
Docket No. FAA-2022-1240
Abstract
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high- pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This AD requires initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with parts eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this AD requires replacing the HPT stage 2 nozzles. The FAA is issuing this AD to address the unsafe condition on these products.