On April 30, 2008, an authorized representative of EPA, conducted a SPCC inspection at Scituate Concrete Pipe Co. Although Scituate Concrete Pipe Co. stores oil in amounts above the thresholds requiring the preparation and implementation of a SPCC plan under 40 C.F.R. Part 112, it did not have an adequate SPCC plan. Because of the size of the facilities and other factors, EPA is utilizing the ESA enforcement tool.