Gin-Spen, Inc. (TXU010452)

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 128134

Penalty
Cost recovery
Compliance action

Case

Case Number
06-2004-2350
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

GIN-SPEN, INC. (TXU010452): A storm water compliance inspection was conducted June 2, 2004, by the EPA to determine compliance with the Texas Commission on Environmental Quality (TCEQ) Construction General Permit (CGP). This was a linear construction site of approximately seven (7) acres for the installation of a 24 water transmission line. As General Contractor for the City of Heath, Gin-Spen, Inc., had submitted timely a Notice of Intent (NOI) but had not received it�s permit number at the time of the inspection. Observations noted permit violations, including no site inspections had been conducted, controls had not been installed and/or maintained in accordance with the Storm Water Pollution Prevention Plan (SWPPP), and there were no required postings. An administrative order was drafted to address these violations.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown