THE ORDER REQUIRES SUBMISSION OF A REVISED SWPPP, AND AN EVALUATION OF THE ALTERNATIVE STORMWATER MEASURES THAT ARE NECESSARY TO ENSURE THAT THE CONSTRUCTION SITE COMPLIES WITHTHE POST-CONSTRUCTION REQUIREMENTS OF THE CTDEP's CONSTRUCTION GENERAL STORMWATER PERMIT.