DURING MULTI-MEDIA INSPECTION OF FACILITY IN JULY 1997, EPA INSPECTOR DISCOVERED THAT THE ATG RELEASE DETECTION SYSTEM ON TANKS 295D AND 833B WERE NOT FUNCTIONING PROPERLY AND THEREFORE NO RELEASE DETECTION WAS BEING PERFORMED FOR THESE TANKS. THE INSPECTOR ALSO DISCOVERED THAT TANK 830C HAD TWO FILL LINES BUT ONLY ONE FILL LINE HAD THE REQUIRED SPILL PREVENTION EQUIPMENT.