AS A RESULT OF AN EPA INSPECTION IN OCTOBER 2004 AND NOVEMBER 2004, EPA ALLEGES THAT PMC HAS VIOLATED 40 C.F.R. PART 63 SUBPARTS N AND T BY FAILING TO EMPLOY ONE OF THE SPECIFIED CONTROL COMBINATIONS FOR A DEGREASER; HAVE AN O and M PLAN FOR A DEGREASER; SUBMIT ANNUAL REPORTS AND SEMI ANNUAL EXCEEDANCE REPORTS FOR BOTH DEGREASERS. HAVE O and M PLAN FOR A CHROMIUM TANK, AND SUBMIT ONGOING COMPLIANCE STATUS REPORTS FOR A CHROMIUM TANK. EPA ALSO ALLEGES THAT PMC FAILED TO OPERATE ITS THERMAL OXIDIZER AT OR ABOVE THE MINIMUM REQUIRED TEMPERATURE ON FIVE DAYS IN 2003.