← EPA enforcement cases

OLIN / MCINTOSH OU1

Judicial · FY1994 · — · Final Order With Specified Cost Recovery · 21055

Penalty
$889K
Cost recovery
$9.96M
Compliance action

Case

Case Number
04-1994-0265
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
DOJ Docket
90-11-2-1001
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

REGION IV ENTERED INTO A CERCLA SECTION 106/107, 42 U.S.C. SECTION 9606/9607, CONSENT DECREE WITH OLIN CORPORATION (OLIN) FOR THE PERFORMANCE AND FUNDING OF A COMPLETE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) FOR OPERABLE UNIT 1 AT THE OLIN CHEMICAL/MCINTOSH PLANT SITE, MCINTOSH, WASHINGTON COUNTY ALABAMA (THE SITE) AND FOR REIMBURSEMENT OF 100% OF PAST COSTS INCURRED AT THE SITE. THE REMEDIAL DESIGN/REMEDIAL ACTION (RD/RA) AT THE SITE HAS BEEN DIVIDED INTO TWO OPERABLE UNITS. OU1 CONSISTS OF THE ACTIVE PRODUCTION FACILITY; AND OU2 INCLUDES THE BASIN AND THE WASTEWATER DISCH LEADING TO THE BASIN. A ROD FOR OU1 WAS SIGNED ON DECEMBER 16, 1994. EPA SEND OLIN A SPECIAL NOTICE LETTER ON 1/11/95 AND A GOOD FAITH OFFER WAS RECEIVED ON 2/17/95. OLIN SIGNED THE CD FOR OU1 ON 6/8/95. REGION IV SIGNED THE CD FOR OU1 ON 6/16/95 AND DOJ SIGNED ON 7/3/95. 2. OLIN CORP., AS THE OWNER AND OPERATOR OF THE FACILITY, AS WELL AS THE GENERATOR OF THE HAZARDOUS SUBSTANCES RELEASED INTO THE ENVIRONMENTAL AT THE SITE, IS THE ONLY CERCLA SECTION 107(A) LIABLE PARTY. 3. UNDER THE TERMS OF SETTLEMENT EMBODIED IN THE CD, OLIN WILL PERFORM AND FUND THE ENTIRE OU1 RD/RA, AND REIMBURSE THE U.S. FOR COSTS INCURRED BY THE U.S. UNDER THE TERMS OF THE CD, INCLUDING, BUT NOT LIMITED TO OVERSIGHT COSTS. THE ESTIMATED COST OF IMPLEMENTING THE S

Source

Authoritative
EPA ECHO