CONSENT AGREEMENT AND ORDER ON CONSENT FOR COMPLIANCE - 8/16/2001. RESPONDENT FAILED OBTAIN AN E & S PLAN APPROVAL PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITIES AT THE SITE. RESPONDENT VIOLATED THE TERMS AND CONDITIONS OF THE NPDES PERMIT DUE TO EXCESSIVE SLOPES ON DITCH BANKS AND SPOIL PILES AND A FAILURE TO STABILIZE SEDIMENT AND RETAIN IT ON THE SITE. RESPONDENT FAILED TO OBTAIN AN NPDES PERMIT FOR A DISCHARGE OF STORM WATER. RESPONDENT FAILED TO INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT ADEQUATE MEASURES TO CONTROL AND RETAIN SEDIMENT; DITCH, SWALE AND STOCKPILE SLOPES WERE EXCESSIVELY STEEP CAUSING SLOPES TO BE EROSIVE AND IN MANY AREAS COLLAPSE INTO DITCH CHANNESL; AND FAILURE TO INSTALL ADEQUATE GROUND COVER TO RETAIN SEDIMENT THROUGH- OUT THE ENTIRE SITE. IN VIOLATION OF CWA SECTION 404. REDS NO: 2000042125091830