EMERGENCY REMOVAL ORIGINALLY DONE AT SITE FROM APRIL TO JUNE 1983. HOWEVER, TWO TANKS CONTAINING APPROX 30,000 GAL- LONS OF MATERIAL EACH WERE LEFT ON SITE. THIS REMOVAL WOULD INVOLVE REMOVING AND DISPOSING OF THAT REMAINING MATERIAL. A COST RECOVERY ACTION WAS BROUGHT AGAINST PRPS IN CONNECT TION WITH EARLIER REMOVAL. A SETTLEMENT WAS REACHED AND A CONSENT DECREE WAS ENTERED BY THE PARTIES.