RESPONDENT TO THIS AOC IS ALREADY COMPLYING WITH AN AOC FOR REMEDIAL DESIGN FOR THE ENTIRE SITE. AS PART OF THE RD PROCESS, RESPONDENT PROPOSED EXTENDING A PRIOR SHORELINE STABILIZATION PROCEDURE (SINCE THE RD WILL TAKE SOME TIME TO CACULATE). EPA CONCERNED AND PROPOSED USE OF THIS AOC TO CONDUCT THE SHORELINE STABILIZATION AS A REMOVAL ACTION. THE CANNELTON INDUSTRIES SITE IS A FORMER LEATHER TANNERY LOCATED IN SAULT STE. MARIE, MI. IN 1992, EPA ISSUED A ROD REQUIRING CONSTRUCTION OF AN ON-SITE LANDFILL AND EXCAVATION OF CHROMIUM CONTAMINATED SEDIMENTS. ON 4/12/93, EPA ENTERED INTO AN ADMINISTRATIVE ORDER ON CONSENT, PURSUANT TO CERCLA 106, FOR REMEDIAL DESIGN WITH CANNELTON INDUSTRIES. CANNELTON INDUSTRIES AGREED TO PERFORM THE REMEDIAL DESIGN FOR EPA'S SELECTED REMEDY AT THE SITE. SECOND MODIFICATION OF AOC FOR REMEDIAL DESIGN ISSUED 4/15/97.