VIOLATIONS OF SDWA UIC REQUIREMENTS AT SECTION 1423 RELATED TO: 1). FACILITY EXCEEDED THE MAXIMUM PERMITTED INJECTION PRESSURE 2). FACILITY FAILED TO MANINTAIN SUFFICIENT PRESSURE DIFFERENTIAL BETWEEN THE ANNULUS AND THE INJECTION TUBING. THESE VIOLATIONS CAN BE CONSIDERED PERMIT VIOLATIONS. UNDER 40 CFR 144.51 VIOLATIONS OF UIC PERMIT COUNT I: FAILURE TO MAINTAIN ANNULUS/TUBING DIFFERENTIAL. COUNT II: FAILURE TO MONITOR INJECTION PRESSURE DURING A WELL SHUT-IN. COUNT III: FAILURE TO INJEST AT PRESSURES BELOW THE LIMITATIONS SET FORTH IN THE PERMIT. COUNT IV: FAILURE TO SUBMIT ACCURATE REPORTS.