Within 30 calendar days of receipt of this Order, Respondent shall develop a revised Sample Plan Chart for the SSP and submit in its entirety for the EPA to review. The plan must identify sampling sites (both routine and repeat) and a sample collection schedule that is representative of water
throughout the distribution system, as required by 40 C.F.R. ? 141.853(a)(1). A template can be found at https://www.epa.gov/region8-waterops/revised-total-coliform-rule-sample-siting-plan.
Within 90 calendar days after receipt of this Order, Respondent shall deliver a consumer notice of individual tap monitoring results to the persons served at each sampled site, in accordance with 40 C.F.R. ? 141.85(d). The included link gives access to the template for the consumer notice certification:
https://www.epa.gov/sites/production/files/documents/LCR_CN_Certification_Form.pdf. Within 90
calendar days following the end of each monitoring period, Respondent shall submit to the EPA a
sample copy of the consumer notification along with a certification that the notification has been
distributed, in accordance with 40 C.F.R. ? 141.90(f)(3).
For each calendar year, Respondent shall prepare and distribute a CCR by July 1st of the
following year and provide a certification to the EPA within three months, as required by 40 C.F.R.
?? 141.151-155.
Within 30 calendar days after receipt of this Order, and as required by Part 141 thereafter,
Respondent shall monitor the System?s water for styr