1. SECTION 311(B)(6)(B)(I) OF THE CLEAN WATER ACT ( CWA ), 33 U.S.C. SECTION 1321(B)(6)(B)(I), AS AMENDED BY THE OIL POLLUTION ACT OF 1990. 2. CHADCO, INC. FACILITY: TENSAS BASIN LEVEE DISTRICT LEASE TANK BATTERY TULLOS-URANIA FIELD TULLOS, LA SALLE PARISH, LOUISIANA 71479 3. RESPONDENT WAS IN VIOLATION OF SECTION 311 OF THE CWA BY: 1) PLAN NOT CERTIFIED BY A PROFESSIONAL ENGINEER; 2) IN- ADEQUATE OR NO PREDICTION OF EQUIPMENT FAILURE WHICH COULD RESULT IN DISCHARGES; 3) INSPECTIONS REQUIRED BY 40 CFR PART 112 ARE NOT IN ACCORDANCE WITH WRITTEN PROCED- URES DEVELOPED FOR THE FACILITY; 4) WRITTEN PROCEDURES AND A RECORD OF INSPECTIONS ARE NOT SIGNED BY FACILITY SUPERVISOR; 5) WRITTEN PROCEDURES AND A RECORD OF INSPEC- TIONS ARE NOT MADE PART OF THE PLAN; 6) NO TRAINING ON THE OPERATION AND MAINTENANCE OF EQUIPMENT TO PREVENT DISCHARGES; 7) NO TRAINING ON THE APPLICABLE LAWS, RULES, AND REGULATIONS; 8) SPILL PREVENTION BRIEFINGS ARE NOT SCHEDULED AND CONDUCTED PERIODICALLY; 9) EXCESSIVE VEGE- TATION WHICH AFFECTS THE INTEGRITY OF THE CONTAINMENT SYSTEM; 10) INADEQUATE OR NO FLOWLINE MAINTENANCE PRO- GRAM: AND 11) PLAN HAS INADEQUATE OR NO DISCUSSION OF OIL PRODUCTION FACILITIES. 4. RELIEF SOUGHT PURSUANT TO SECTION