THIS IS AN UST COMPLAINT CONSENT AGREEMENT/FINAL ORDER (CA/F O). A CA/FO WAS ISSUED FOR THE FOLLOWING VIOLATIONS: FAILUR E TO PROVIDE ANY CORROSION PROTECTION FOR METAL PIPING; FAIL URE TO HAVE AN OVERFILL PREVENTION SYSTEM ON A NEW TANK; FAI LURE TO HAVE SPILL PREVENTION AND OVERFILL PREVENTION SYSTEM ON AN EXISTING TANK; FAILURE TO PROVIDE ADEQUATE RELEASE DE TECTION METHOD FOR PETROLEUM TANKS; FAILURE TO CONDUCT LINE TIGHTNESS TEST OR USE MONTHLY MONITORING ON SUCTION PIPING; FAILURE TO COMPLY WITH FINANCIAL RESPONSIBILITY REQUIREMENTS