← EPA enforcement cases

MS. ELDA MILLER C/O ROY SOUSLEY

Administrative - Formal · FY2007 · — · — · 600044803

Penalty
Cost recovery
Compliance action

Case

Case Number
03-2007-0202
Type
Administrative - Formal
Lead
EPA
Outcome
Multimedia
Self-disclosure
N

Defendants (1)

Summary

AT THE DIRECTION OF MS. ELDA MILLER(LANDOWNER), mR ROY SOUSLEY (SON) PLACED FILL MATERIAL WITH A CATCH BASIN AND A RISER PIP IN THE STREAM CHANNEL IN AN EFFORT TO DIVERT THE FLOW INTO AN EXISTING SERIES OF UNDERSIZED CULVERS. THE STRUCTURE IS ACTING AS A DAM AND BACKING UP WATER ONTO THE ADJACENT PROPERTY CAUSING FLOODING. THE TOTAL IMPACT IS 37 LINEAR FEET OF STREAM.

Source

Authoritative
EPA ECHO
Machine