NPDES PERMIT EFFLUENT VIOLATIONS AND NON-PROPER OPERATION AND MAINTENANCE (GENRAL CONDITION C.5) OF THE CAMUY-HATILLO WWTP. PRASA HAS VIOLATED GENERAL CONDITION C.2 OF THE PERMIT WHICH REQUIRES THE PERMITEE TO COMPLY WITH ALL CONDITIONS OF ITS NPDES PERMIT. BY THIS CONSENT ORDER, PRASA HAS AGREED TO IMPLEMENT A PMP; REPAIR AND REPLACE THE INFLUENT PUMPS, REFURBISH THE APU; REPAIR THE ROTARY ARM OF THE BIOFILTER; REPAIR AND REFURBISH THE GRIT CHAMBER MECHANISM; REPAIR AND REFURBISH THE SCUM COLLECTOR MECHANISUM; PROVIDE ENGINEERING ANALYSIS TO EVALUATE CURRENT SLUDGE WASTING PRACTICES AGAINST THE INSTALLATION OF A BELT FILTER PRESS FOR THE CAMUY-HATILLO WWTP; AND SUBMIT TO EPA A QUARTERLY REPORT DETAILING THE STATUS AND PROGRESS OF THEIR EFFORTS TO COMPLY WITH THIS ORDER.